Paramount Mechanics
  • About Us
  • Products
  • Production Process
  • Production Facilities
  • Quality Control
  • Contact Us
    • Contact Form

Production Process

The customer Requirements are studied in detail and Preliminary Design drawing is prepared in 2-D or 3-D software of INVENTOR-AUTO_DESKFORMAT.

On approval of the  customer of the preliminary drawing, The material list is drawn for production and  a proto-type is handed over to customer. Changes,if any, are incorporated as per customer requirements and final production is completed as per standard procedures as below –

  • Material requisition is invariably raised to purchase deptt. to purchase material specified.
  • Normally Aluminium HE-30 grade alloy is purchased for Rugged Enclosures . SS 301 or 316 grade are used wherever required.
  • During manufacture Stage inspection is carried out by Quality deptt. Followed by Sub assembly and Final assembly and product Inspection and clearance is given for packing and despatch.
  • Customer feed back on mechanical enclosures are invariably obtained and incorporated in repeat orders.

Process Sheets :

Process identification sheets for manufacture with tolerances.-Cutting, Drilling, Pressfit, Punching, Welding, Bending, Finishing are invariably prepared.

Machinery to be used in conjuction with process manufacturing sheets are always indicated. Various records maintained are as follows –

  • Material Requisition sheets
  • Receipt Inspection of Material
  • Material Rejection Record.
  • Stock taking and issue, balance register.
  • Quality assurance sheets-Inspection Record-Stage Inspection
      • Subassembly Inspection
      • Welding Inspection
      • Assembly Inspection
      • Final Inspection
      • Finishing Inspection
      • Powder Coating inspection
      • Packing list with preservation methods
      • Despatch & delivery records

Some of the processed Enclosures – Photographs are depicted below –

 

Copyright © 2011 - Paramount Mechanics

Brought to you by Sri Infotech